News and Events

Kevin Reilley was named President of Benchmark in July. Mark Woodward will remain as Chairman.

Tom Munroe, Project Manager, joined Benchmark’s “Green Team” with LEED Accreditation in June 2008.

Brad Fries, Estimator/Project Manager, is the latest Benchmark employee to receive LEED Accreditation.

Clearwater Bend
Completed on schedule.

Maine Supportive Housing
Completed on schedule.

New Construction for 2008-09

Key Bank Headquarters
Corporate Offices Renovation

Bangor Savings
Saco Branch, Total Renovations

Scarborough Terrace
Addition and Renovation
Occupied Assisted Living Facility

Tractor Company Stores
Augusta and Oxford

Services and Capabilities

Design – Build Services
View Job Sheet

General Contracting
View Job Sheet

Construction Management

   
 

Benchmark
34 Thomas Drive
Westbrook, Maine 04092
207.591.7600

Serving Discriminating Owners in Maine and New Hampshire Since 1993.

 
 

Benchmark Construction Project Portfolio

Commercial/Industrial Sites

< Previous Portfolio Piece  
Warren Memorial Library

As Construction Managers for the Warren Memorial Library, Benchmark oversaw construction of the new 7,000 SF addition and 9,700 SF renovation of the original building.

Benchmark moved the existing building twenty feet back from its original location. Prior to moving it, the existing floor, walls and roof systems were structurally reinforced.

The interior and exterior wood finishes reflect the high quality and fine workmanship of this turn-of-the-century library. The existing fireplace and built-in shelving and circulation desk remained in place and were restored. New interior white oak trim on the main floor was reproduced to match the existing trim along with custom designed casings, crown molding, chair rails, and wainscoting.

Benchmark installed all new windows and doors, a new slate roof with cupolas custom copper flashing, and red cedar trim and siding.

The second floor features a conference-meeting room, a kitchen, and an auditorium with a stage. To expand use of the space, Benchmark installed new theater lighting, an audio visual system, and an automated projection screen allowing for a wide range of performance activities.

The project included all new mechanical systems with a computerized energy management system and new sprinkler and electrical systems.