The facility includes loading docks for delivery
and on-grade access allowing trucks to enter the building
for maintenance and service.
For the addition, Benchmark chose the Murox®
Building System with a specially-designed roof. Cantilevered
structural steel roof trusses help to avoid snow drift
loading on the existing structure. By adding steel
pilings along the existing wall to support the roof,
Benchmark minimized impact to the existing foundation
during construction of the new addition.
Benchmark was responsible for obtaining all local
approvals for Southpark.
Though Southpark's distribution facility was constructed
throughout the difficult winter of 2000-01, it was
completed on budget and on time. Both facilities are
fully compliant with ADA requirements.
|